Here you will find all project references in the language you are in right now. We also invite you to browse through our other references in other languages. Just use the "Language drop down" on top.
The freeform architectural design made it a challenge to use traditional structural analysis software on that project. With SCIA Engineer, KPFF were able import and reuse the architectural model, derive an analysis model, and the automatic meshing capabilities provided a mesh that was clean.
At the end of 2008, KAEFER Belgium received a contract to build a complex assembly of scaffolds in the atrium of the mall ‘Sint-Janspoort’ in Kortrijk (B) from its client THV Wijngaard, a temporary
The studies and realisation of the Hans Wilsdorf Bridge required a multidisciplinary team of experts in: special works, civil engineering, environment issues, and bridge design, all integrated within one company.
This project is about one of the largest stages ever toured in any field of entertainment. The structure’s central grid is raised 28 metres high, with legs traversing the width of a soccer pitch.