Skip to main content

SCIA user stories

Our customers' stories speak for themselves: with SCIA software, our users have the right tools to bring amazing projects to life.

Overview filter form

System of Reduction SOx

System of Reduction SOx

The construction is located in Melnik, Czech Republic. The primary purpose of the system is to improve the environmental conditions by reducing SOx emissions.

SCIA Engineer
Bowstring Bridge Stendess

Bowstring Bridge Stendess

The bridge in Tessenderlo had to be rebuild because of the widening of the Albert Canal and the increase of the clearance for shipping traffic.

SCIA Engineer
Bascule Bridge SCIA Engineer

Bascule Bridge

The movable bridge is of the Scherzer type, it spans 50 m and has a width of 16 m, making it one of the largest of its kind.

SCIA Engineer
Dyson Village

Dyson Village

The Dyson Village is a student accommodation complex providing individual studio apartments.

SCIA Engineer
VK Engineering - Möbius Towers

Möbius Towers

The Möbius towers distinguish themselves from their angular neighbour in the Brussels North District by their completely elliptical shape.

SCIA Engineer
Prodis - Sky Park Residence

Sky Park Residence

The Sky Park Residence apartment blocks are the first phase of the Sky Park multipurpose complex located close to the centre of Bratislava.

SCIA Engineer
Expo Pavillon 6

Expo Pavillon 6

The new “Pavillon 6” in the Porte-De-Versailles exposition site in Paris consists of an exposition area of 15,000 m².

SCIA Engineer
DEWA Concentrated Solar Power Tower

DEWA Solar Tower

The DEWA Concentrated Solar Power Tower is a part of the largest solar park on earth located 50 km from Dubai.

SCIA Engineer
Festival Stage Rigoletto

Festival Stage Rigoletto

A “head with a boom” represents the central scene of the open-air stage designed for the “Rigoletto” opera presented during the Bregenz Festival in Austria.

SCIA Engineer
Extractor Shell Reinforcement (Olomouc, Czech Republic)

Extractor Shell Reinforcement

The existing steel structure of an extractor is a cylindrical shell with a radius of 3.25 m and a height of 6.82 m, reinforced by rings. 

SCIA Engineer
We invite you to browse through the different user projects.
Tip: if you change the language in the upper right corner, you'll also discover the international projects.
Have fun!
Don't miss anything

Sign up to our newsletter

The most valuable industry insights, up-to-date software tips & tricks, exclusive webinar invitations and much more: subscribing to our monthly newsletter is a must!

Don't hesitate and subscribe today!
In case, unsubscribing is easy afterwards.